Vasilis (Bill) Marangozis

ISLAND FUTURES · PUBLIC POLICY

Sustainable Tourism Development in Small Island Destinations

Paros as a Case Study in an International Comparative Framework

Public edition 1.1 · 21 July 2026
Evidence and sources as of 19 July 2026

Sustainable Tourism Development in Small Island Destinations — Vasilis (Bill) Marangozis

How can Paros preserve the value of tourism while protecting the resources, services and qualities of place on which its success depends?

Executive summary

An abridged web adaptation of the accompanying executive summary. The complete summaries and full Greek study are available below.

The question behind the study

Tourism has brought Paros income, employment, businesses and international recognition. It has also increased pressure on water, wastewater, solid waste, housing, mobility, land, public services and the capacity of local government to manage change.

The study asks how these economic and social benefits can be sustained without weakening their foundations. Its answer is a system of timely measurement and public decision-making: establish actual loads, safety margins, full costs, responsibilities and distributional consequences before approving major development, expensive infrastructure or broad restrictions.

What the evidence tells us

The available official evidence is incomplete, but it reveals a scale and pace of change that warrant coordinated action. These indicators describe different years and different measures; they are not a calculation of the island’s carrying capacity.

IndicatorReported figureQualification
Permanent population14,520 · 2021Year-round residents
Housing16,152 dwellings8,523 holiday or secondary dwellings
Hotel capacity141 establishments / 7,510 beds · 2025Hotels only; not all accommodation
Air passenger movements361,884 · 2024Passenger movements, not unique visitors
Port passenger movements2,213,917 · 2024Embarkations and disembarkations
Water consumption2,549,388 m³ · 2025Recorded annual consumption; +82.27% since 2011
Permitted floor area545,297 m² · 2011–2025Permits do not establish completed development
New dwellings4,055 · 2011–2025Not all new buildings are tourism-related
Wastewater capacity33,000 population equivalentsPublished nominal capacity across three facilities
Solid wasteMore than 11,000 tonnes · 2019Historical figure; current adequacy requires updated data

Definitions, detailed sources and qualifications: Chapters 4–6 and Technical Appendix A of the full study.

The critical issue: pressures that peak together

Annual totals can conceal operational stress lasting hours or days. Water, wastewater, waste collection, electricity, transport, healthcare and civil protection may all be under pressure at once. A hot, dry week combined with an equipment failure or transport disruption can expose weaknesses that nominal capacity figures do not show.

The proposed response is synchronised measurement for the same day and operational zone: actual population present; water production, storage and consumption; wastewater loads; waste collection and final destinations; vehicle movements; critical energy demand; and available staff and contingency resources.

International lessons, applied with care

The comparative analysis considers Formentera, Menorca, Gozo, Lord Howe Island and Boracay, alongside regulatory developments in the Canary and Balearic Islands.

Menorca illustrates daily population measurement. Formentera highlights entry controls supported by exemptions, transport alternatives and review. Gozo contributes water diversification and redundancy; Lord Howe, consistent planning and enforcement. Boracay demonstrates the social and economic costs of delayed compliance.

These are lessons to evaluate locally. Each intervention needs a measurable problem, lawful authority, administrative capacity, workable alternatives and monitoring of unintended consequences.

A balanced, adaptive programme for 2026–2035

The study compares five pathways: continuing current trends; expanding technical capacity; managing demand and peaks; adopting a balanced, adaptive portfolio; and increasing local value per unit of environmental and social pressure.

It favours the fourth pathway, strengthened by the economic objective of the fifth. Infrastructure remains necessary, but its value depends on safe operation, maintenance, staff, funding and its effects on other island systems. Higher visitor spending alone does not establish sustainability.

  • Meet existing obligations for water quality, wastewater, waste, safety and accessibility.
  • Reduce losses, maintain networks and provide operational redundancy.
  • Protect vulnerable land, coasts and water resources before irreversible loss.
  • Support essential staff housing, reliable transport and better local employment.
  • Test a small number of reversible measures, with public data and clear stop rules.

From evidence to implementation

The proposed timetable starts with responsibilities and operational evidence, followed by targeted improvements and evaluated pilots.

First 100 days

Agree the programme, name responsible leads, inventory data and projects, identify staffing gaps and publish a timetable.

2026–2027

Establish a synchronised baseline, a water balance and contingency testing for loss of the largest critical unit; update continuity plans and housing inventories.

2027–2029

Prioritise maintenance, leakage reduction, waste separation, essential staff housing and public transport.

2028–2030

Run no more than two demanding pilots simultaneously, each with a baseline, budget, alternatives, exemptions, displacement checks and a stop rule.

2030

Conduct an independent strategic review: scale, modify, retain or terminate measures.

2031–2035

Adopt permanent investments or regulations only after need, safe operation, capacity, funding and equitable distribution are established.

Clear responsibilities and public accountability

The proposal is a small programme coordination unit connecting existing authorities, while each retains its statutory responsibilities. The Municipality coordinates within its powers; the water utility addresses water and wastewater; port and transport bodies address access and mobility; waste authorities and competent services address the waste system. Regional and central authorities retain their own legal responsibilities.

Businesses, residents, workers and civic organisations contribute evidence and scrutiny. Independent evaluators review methods, outcomes and unintended consequences. Staff, time and operating budgets are part of implementation capacity: a rule that cannot be enforced is an incomplete policy.

Scope, uncertainty and responsible use

The study does not establish a final island-wide maximum for visitors, vehicles or beds. It does not convert passenger movements into unique tourists, building permits into completed tourism accommodation, or nominal treatment capacity into demonstrated resilience.

It does not propose blanket restrictions without evidence and a legal basis, nor replace the engineering assessment, legal opinion or democratic decision needed for a specific intervention. Uncertainty becomes an obligation to measure and a rule for deciding what can proceed now and what must wait.

The cost of inaction also matters: leakage, interruptions, emergency supply, staff shortages and delayed compliance carry costs. The study calls for whole-life and distributional assessment without assigning an arbitrary monetary value to a hypothetical crisis in Paros.

Read the publications

The full study is in Greek. Both executive summaries are available as separate PDFs.

Suggested citation

Marangozis, V. (2026). Sustainable Tourism Development in Small Island Destinations: Paros as a Case Study in an International Comparative Framework. Public edition 1.1, 21 July 2026. [Greek-language study.]